Wy’east Engineering

~

Standard Specifications and Standard Plans

The Wy’east Engineering Standard Specifications and Standard Plans have been prepared solely for use on projects prepared by Wy’east Engineering.  Said Standard Specifications and Standard Plans may make reference to the standards of other agencies and organizations.  Such reference does not constitute an endorsement by Wy’east Engineering of said standards.  These Standard Specifications and Standard Plans are provided solely for the convenience of the user and the user shall be fully responsible for the use of these standards except as part of a project prepared by Wy’east Engineering.

 

The user of these Standard Specifications and Standard Plans is advised that, although every effort has been made to eliminate errors herein, some minor errors, discrepancies, or omissions may exist.  It would be appreciated if users of these specifications would notify Wy’east Engineering of any required corrections at their earliest convenience.  Such corrections may be forwarded to Wy’east Engineering using the prompt below.

 

Access to the following standard specifications and standard plans may be obtained by contacting Wy’east Engineering.

Standard Plans

Division 1 - General Conditions

 

Copyright© 2012 Wy’east Engineering.  All rights to the use of these Standard Specifications and Standard Plans, including its reproduction, duplication, and/or distribution are reserved to Wy’east Engineering.  Use by other parties or any modification, reproduction, duplication, or distribution of said Standard Specifications and Standard Plans or citation of excerpts, data, or provisions without the express written consent of Wy’east Engineering is strictly prohibited.

Division 2 - General Technical Requirements

Division 3 - Waterworks

Division 4 - Sitework

Standard Specifications

©2012 - Wy’east Engineering

Division 5 - Stormwater and Wastewater

Division 6 - Electrical and Instrumentation

2-01.01 - Utility Marking Systems

2-01.02 - Utility Marking Systems - Color Reference Chart

2-02 - Construction Entrance

3-01.01 - Standard Domestic Combined  Service - Buried Backflow Device

3-01 .03- Standard Combined Domestic Service Above Grade Backflow Device Plan

3-02.01 - Standard Domestic Service - Future Service

3-02.02 - Standard Domestic Service - No Meter

3-02.03 - Standard Domestic Service - Standard Installation

3-02.03 - Standard Domestic Service with Pressure Reducing Valve

3-03 - Standard Domestic Fire Service

3-04.01 - Trench Detail - Sand Backfill

3-04.02 - Joint Trench Detail - Sand Backfill

3-04.03 - Trench Detail - Sand-Cement Slurry Backfill

3-04.04 - Joint Trench Detail - Sand- Cement Slurry Backfill

3-05 - Chlorination Tap

3-06 - Blow Off Assembly

3-07.01 - Buried Valve Assembly - (E)Pavement Installation

3-07.02 - Buried Valve Assembly - (N)Pavement Installation

3-07.03 - Buried Valve Assembly - Unpaved Installation

3-07.04 - Buried Valve Assembly - Operator Extension

3-08.01 - Thrust Restraint - Thrust Blocking

3-01.02 - Standard Domestic Combination Service - Above Grade Backflow Device

3-08.02 - Thrust Restraint - Mechanical Restraint - Horizontal Alignment

3-10.01 - Fire Hydrant Assembly Details - Wet Barrel Hydrant General Details

3-08.03 - Thrust Restraint - Mechanical Restraint - Vertical Offset

3-09 - Casing Installation

3-10.02 - Fire Hydrant Assembly Details - Placement and Clearances Plan View

3-10.03 - Fire Hydrant Assembly Details - Placement and Clearances Elevation

3-10.04 - Wharf Head Hydrants

3-10.05 - Fire Hydrant Details - Dry Barrel Hydrants

3-11 - Air/Vacuum Release Assembly

3-12.01 - Title 22 Separation of Mains - Parallel Construction

3-12.02 - Title 22 Separation of Mains - Crossing Construction

3-12.03 - Title 22 Separation of Mains - Material Selection

3-13 - Fire Service Assembly - 4-inch and Larger

3-14 - Pressure Testing

3-15.01 - Flushing and Disinfection Notes

3-15.02 - Flushing and Disinfection - Temporary Supply

6-03 - Pressure Transducer Assembly Details

4-01 - 6-foot Chain Link Fence

4-02 - Miscellaneous Asphaltic Paving

4-03.01 - Curb, Gutter and Driveway Details - Curbs, Gutters, Cross Gutters and Spandrels

4-03.02 - Curb, Gutter and Driveway Details - Residential Driveway Details

4-03.03 - Curb, Gutter and Driveway Details - Commercial Driveway Details

4-04 - Standard Traffic Bollard Details

6-01 Conduit Riser Details

6-02 Ground Rod Details

3-19.01  Wellhead Details - Plan and Elevation

3-19.02  Wellhead Details - Cross Section

3-19.03  Wellhead Details - Notes and Mechanical Schedule

3-17.01  Pipe Assembly Enclosure

3-17.02  Pipe Assembly Enclosure - Hinge Details

3-18  Pipe Support Details

Table of Contents - Page i

Table of Contents - Page ii

Contact Us

Home

Why Wy’east?

Project Documents

Wy’east Standards

Contact Us

Project Gallery

Project Documents Bidding

Projects under Construction

3-16 - ¾ to 2-inch Reduced Pressure Principle Backflow Device Assembly

3-15.03 - Flushing and Disinfection - Tables

3-15.04 - Flushing and Disinfection - Nozzle Table